Project description:
Construction of a container system for heat transformation and storage integration in low-temperature machines.
Scope of Frintec GmbH:
- Installation planning (3D CAD planning)
- Pipe planning and design
- Position, data sheets, lists and specifications
Technical data:
nn
Project period:
2020 to 2023 (with interruption)