CoSOEC

Engineering Rohrbrücke CoSOEC

Project description:

Construction of a pipe bridge including synthesis gas lines and operating fluid lines between the jet fuel synthesis and CoSOEC plant.


Scope of Frintec GmbH:

- Planning

- Completion

- Assembly support and acceptance testing


Technical data:

- Nominal diameter of the pipes DN15 to DN80

- Maximum volume flow 100 m³/h


Project period:

2022 to 2023

back to projects
Share by: