Conversion demo SNG

Conversion demo SNG

Project description:

Implementation of Reconstruction work on the DemoSNG system on the site of the EnergyLab 2.0 on the KIT Campus North.

The plant is equipped with new reactors and the necessary expansion of the peripherals.


Scope of Frintec GmbH:

- Installation planning (3D CAD planning)

- Pipe planning and design

- Position, data sheets, lists and specifications

- Construction, delivery and assembly of pipelines

- Commissioning and acceptance


Technical data:

- Pressure 25 bar

- Temperature 350°C

- Volume flow 10 m³/h

- Thermal power 100 KW


Project period:

2022 to 2023